Recovery you can prove.

We turn end-of-life wind turbine blades and composite production scrap into recovered fiber for new manufacturing — with an evidence record for every batch.

Recovery Assessment
Available now
Industrial pilot
2027
Hub network target
50,000 t/yr by 2033
Based in
Marburg, Germany

Recovered glass fiber from a blade fragment, 2026

Composite waste isn't hard to get rid of. It's hard to bring back into manufacturing.

Composite waste is growing. The routes back into manufacturing are missing.

914kt

of thermoset composite waste in Europe in 2025

Modelled estimate for EU27, UK and Türkiye.

Blade decommissioning, December 2025
Blade decommissioning, December 2025

228kt

realistically accessible for recycling each year

≤ 5%

of that accessible stream is recycled today

52kt

of decommissioned blades a year in Europe by 2030 — up from about 25 kt in 2025

Germany and Spain carry the largest flows.

Why now, in Germany

Landfilling rotor blades has not been permitted in Germany since 2005, and Europe's wind industry has committed to re-use, recycle or recover every decommissioned blade. Today a large share of GFRP still ends up in cement kilns or lower-value products — the fiber is lost.

The recovered material needs a new application.

Four barriers between waste and a new application.

Recycling technologies exist. What is missing is a route that connects feedstock, processing, quality and the buyer.

  1. 1

    Heterogeneous feedstock

    Different resins, fillers and metals. Shell, spar and root need different preparation and process settings.

  2. 2

    Economics and logistics

    Blades are bulky and dispersed. A central plant needs investment before feedstock and sales are secured.

  3. 3

    Specification

    Buyers need measurable parameters: organic residue, glass chemistry, purity, geometry and batch consistency.

  4. 4

    Evidence

    The link between waste origin, process, analyses and the buyer's decision is usually missing.

One controlled route — from waste owner to material decision.

We manage the recovery of composite material and document the result of every batch.

From

Blade segments and GFRP scrap

End-of-life rotor blades, production cut-offs and rejects — taken as they are and cut to chamber size.

We take your composite waste

To

Qualified fiber and glass for remelting

Long recovered glass fiber for new products, and a glass fraction as feedstock for new glass fiber.

Buy recovered material
  1. 01

    Process tailored to feedstock

    Composition, resin type, laminate thickness and impurities set the preparation and process regime.

  2. 02

    Phased scale-up at industrial sites

    Containerized modules at existing sites. Capacity grows with feedstock flows and sales.

  3. 03

    Qualification to buyer requirements

    Post-treatment and testing against agreed criteria — for fiber reuse or for remelting.

  4. 04

    Evidence for every batch

    The Digital Recovery Record links origin, process, mass balance and analyses to the decision.

Six steps from blade to batch record.

The fiber is the product. Every step is built to keep it long, clean and documented.

Macroscopy · MPA-IfW, TU Darmstadt · June 2026

Laboratory card · SC-B-0001

  • Fiber lengthMeasured
  • Organic residueLoss on ignition
  • Glass chemistryEDX
  • Fiber surfaceSEM
  • Single-fibre tensileFavimat+

MPA-IfW · FTZ Leipzig · ASG Analytik · FIBRE

Digital Recovery Record

Batch · SC-B-0001

  • OriginGFRP / epoxy, blade shell
  • ProcessPyrolysis, oxygen-free
  • QualitySEM/EDX, loss on ignition
  • Buyer decisionAccepted with conditions

Illustrative example · record in beta

01

Assessment

We start with the material: composition, impurities, thickness — and what the future buyer needs.

  • GFRP
  • Epoxy
  • Balsa / PVC foam
  • Metal inserts
02

Preparation

Blades are cut on site into segments of about 1 × 1 m — not shredded — so the fibers stay long, up to about a metre.

  • No fine shredding
03

Recovery

Oxygen-free pyrolysis at 400–550 °C. The resin breaks down into oil and gas; the fibers stay.

  • 400–550 °C
  • Oil
  • Gas heats the process
04

Post-treatment

Controlled post-treatment removes matrix residues. Black, bonded fiber becomes white and separable.

  • Black to white
05

Qualification

We test against agreed buyer criteria and classify the fiber: length, organic residue, glass chemistry, purity.

  • Independent laboratories
06

Record

Origin, process, mass balance and analyses — linked to the buyer's decision in one batch record.

  • Batch SC-B-0001

Schematic — not to scale. Process parameters depend on feedstock.

  1. 01

    Assessment

    We start with the material: composition, impurities, thickness — and what the future buyer needs.

    • GFRP
    • Epoxy
    • Balsa / PVC foam
    • Metal inserts
  2. 02

    Preparation

    Blades are cut on site into segments of about 1 × 1 m — not shredded — so the fibers stay long, up to about a metre.

    • No fine shredding
  3. 03

    Recovery

    Oxygen-free pyrolysis at 400–550 °C. The resin breaks down into oil and gas; the fibers stay.

    • 400–550 °C
    • Oil
    • Gas heats the process
  1. 04

    Post-treatment

    Controlled post-treatment removes matrix residues. Black, bonded fiber becomes white and separable.

    • Black to white
  2. 05

    Qualification

    We test against agreed buyer criteria and classify the fiber: length, organic residue, glass chemistry, purity.

    • Independent laboratories
  3. 06

    Record

    Origin, process, mass balance and analyses — linked to the buyer's decision in one batch record.

    • Batch SC-B-0001

    Batch · SC-B-0001

    Feedstock
    GFRP / epoxy, blade shell
    Source
    Rotor blade, decommissioned 12.2025
    Route
    Pyrolysis, oxygen-free
    Decision
    Accepted with conditions

    Illustrative example · record in beta

Schematic — not to scale. Process parameters depend on feedstock.

What comes out — and where it goes.

  • 01

    Recovered glass fiber

    Long fibers for nonwovens and composite intermediates.

    Samples with buyers
  • 02

    Glass fraction for remelting

    Feedstock for the production of new glass fiber.

    In evaluation
  • 03

    Pyrolysis oil

    Composition analysed; the route for its use is under evaluation.

    Analysed
  • 04

    Process gas

    Returned to heat the process; measured in the industrial pilot.

    Measured in pilot

Fiber grades by length and cleanliness — coming with the industrial pilot.

Request fiber samples and data

One route for many composite streams.

We start with rotor blades and GFRP production scrap. The assessment is open for every other composite stream today.

  1. 01

    Wind energy

    End-of-life and repowering blades

    Blades come down faster than qualified routes appear.

    We take segments from decommissioning sites and recover the fiber.

    Focus now
  2. 02

    GFRP production scrap

    Cut-offs, rejects, cured laminate

    Scrap is paid for twice: once as material, once as disposal.

    We screen the stream and recover fiber close to the source.

    Focus now
  3. 03

    Marine and boats

    Hulls and moulds at end of life

    Decades of GRP hulls have no route back into materials.

    We assess what the laminate can become before anything is cut.

    Open for assessment
  4. 04

    Rail, bus and automotive

    Body panels, interior parts, SMC

    Mixed laminates and fillers make recovery hard to predict.

    We test the stream and document what comes out.

    Open for assessment
  5. 05

    Aerospace and CFRP

    Carbon fiber laminates and prepreg scrap

    High-value fiber needs its own qualification path.

    We run CFRP as a separate, documented assessment.

    Open for assessment

Independent analyses, not promises.

We publish what was measured, who measured it — and what the industrial pilot measures next.

  1. 12.2025

    Real blade segments from a decommissioning site

    All tests start from end-of-life rotor blades, cut on site.

    Decommissioning partner

    Verified
  2. 02.2026

    First pyrolysis run on blade material

    Blade segments processed in a partner's industrial reactor; first mass balance recorded.

    Technology partner

    Verified
  3. 06.2026

    Black and bonded becomes white and separable

    Macroscopy and SEM/EDX before and after thermal post-treatment at 400 °C.

    MPA-IfW, TU Darmstadt · report F 260733

    Verified
  4. 06.2026

    Fiber surface compared with reference samples

    Light microscopy, SEM and EDX mapping of fiber surfaces.

    FTZ Leipzig · HTWK Leipzig

    Verified
  5. 06.2026

    Oil composition analysed

    Laboratory analysis of the pyrolysis oil fraction.

    ASG Analytik

    Verified
  6. 10.2026

    Single-fibre tensile testing of recovered fiber

    Tensile tests on individual recovered glass fibers, 25 measurements.

    Faserinstitut Bremen (FIBRE) · report AU-261013-8347-3

    Verified
  7. Q4 2026

    Buyer evaluation of samples

    Glass fiber and nonwoven manufacturers are evaluating recovered fiber.

    Material buyers

    In progress
  8. 2027

    Industrial pilot

    Repeat batches on a real waste stream.

    SustainCore with partners

    Planned
After: white, separable
Before post-treatment: black, bonded
Before post-treatment: black, bondedAfter: white, separableMacroscopy · MPA-IfW, TU Darmstadt · June 2026

Mass balance of the first run

  • Fiber-rich fraction~55 %
  • Oil~21 %
  • Gas and water~24 %

First run · partner data · n = 1

Before you invest in a recycling pilot, find out what your composite can actually become.

The Composite Recovery Assessment is stage one of the recovery route: a physical recovery test, independent laboratory analyses and a documented decision — at a fixed price.

  • 01

    Recovery Screening

    Is this material worth investigating?

    €2,900 excl. VAT

    • Material and problem assessment
    • Recovery route screening — not automatically pyrolysis
    • Initial sample test where technically justified
    • Digital Recovery Record — Basic
    Decision

    Go / Investigate / No-go

    Request a Screening
  • 02Recommended

    Recovery Feasibility

    Can it become a credible secondary material?

    €8,500 excl. VAT

    • Everything in Screening
    • Controlled recovery test with mass balance
    • Independent laboratory characterisation
    • Application and market fit: 2–4 routes
    • Preliminary economics
    • Digital Recovery Record — Standard
    Decision

    Stop / Optimise / Validate at scale / Prepare a pilot

    Request Feasibility
  • 03

    Pilot Readiness

    What exactly should a pilot prove?

    €19,500 excl. VAT

    • Everything in Feasibility
    • Extended validation over several conditions
    • Buyer-oriented qualification plan
    • Pilot business case and architecture
    • Regulatory pre-screening
    • Digital Recovery Record — Pilot
    Decision

    Pilot go / no-go

    Request Pilot Readiness

How it works

  1. 01

    Scoping call

    Twenty minutes: your material, your volumes and the decision you need.

  2. 02

    Sample and data

    You send a sample and what you know about it.

  3. 03

    Test and analyse

    Recovery test, independent laboratories, application check.

  4. 04

    Decision memo

    A documented result for your management — with the batch record.

What you hold in your hands

  • Decision memo with a clear recommendation
  • Mass balance and photo documentation
  • Independent laboratory results
  • Digital Recovery Record for the batch

We can also tell you no. That is part of the value.

Results depend on the sample provided and are directional — not a guarantee of recovery performance, yield or commercial viability at scale. Laboratory results are coordinated third-party data.

One recycling model. Three ways to host it.

We choose the format to fit the flow, the partners and the site.

  • 01

    Own hub

    We invest through a project company together with investors and operate the plant.

    Who invests
    Project company with investors
    Who operates
    SustainCore
    How SustainCore earns
    Processing and material sales
  • 02

    Partner hub

    The partner owns the plant on its own brownfield site. We run the route and quality assurance.

    Who invests
    Partner
    Who operates
    Partner, with our route and QA
    How SustainCore earns
    Start-up and support fee, profit share by contract
  • 03

    Joint hub

    Joint investment and management through a shared project company.

    Who invests
    Both partners
    Who operates
    Jointly
    How SustainCore earns
    Payment for work performed and profit share

Brownfield first: existing industrial infrastructure and permits, usable in any format.

Two revenue streams per tonne: a gate fee for the waste and the sale of qualified fiber.

Discuss a hub at your site

From one module to a regional network.

  1. 01

    One stream

    A containerized module at an existing industrial site.

  2. 02

    Module cluster

    Several chambers on one condensation line.

    ≈ 10,000t/yrtarget per hub

  3. 03

    Hub network

    Regional hubs across Germany and the EU.

    50,000t/yrtarget by 2033 · 5 hubs

Module cluster on site — concept layout
  1. Q4 2026In progress

    Buyer evaluation

    Written opinions on quality and application of the recovered fiber.

  2. 2027Planned

    Industrial pilot

    Repeat batches on a real waste stream. Full per-tonne economics.

  3. 2028Planned

    Module cluster

    First hub, scaled to flow and sales.

  4. 2030+Planned

    Hub network

    Roll-out in Germany and the EU.

Sites

  • Hub 01 — HessePositive site screening in an industrial park.In progress
  • Next sitesOpen for host partners with brownfield sites.Host a hub

Capacities are targets from our engineering model — not installed capacity.

Every batch should explain why the material was accepted — or rejected.

The record links origin, process, mass balance and analyses to the buyer's decision. Waste owners use it for ESG and CSRD reporting, buyers for qualification, auditors by permission.

  • Waste owner — ESG and CSRD
  • Buyer — qualification
  • Auditor — access by permission

Digital Recovery Record

Batch · SC-B-0001

  1. 01Origin

    Feedstock
    GFRP / epoxy, blade shell
    Source
    Rotor blade, decommissioned 12.2025
    Sample
    Segment 1 × 1 m
  2. 02Process

    Route
    Pyrolysis, oxygen-free
    Regime
    400–550 °C
    Mass balance
    Recorded per fraction
  3. 03Quality

    Methods
    SEM/EDX, loss on ignition
    Laboratory
    Independent, named in the record
    Limits
    Stated with every result
  4. 04Buyer decision

    Decision
    Accepted with conditions
    Next step
    Qualification run

Illustrative example · record in beta

We return materials to the economy — and measure the whole route.

  • 9

    Industry, innovation and infrastructure

    Regional hubs on existing industrial sites.

  • 12

    Responsible consumption and production

    Fiber and glass return to manufacturing; mass tracked per batch.

  • 13

    Climate action

    The CO₂ effect is determined by a comparative LCA built on batch data.

  • 17

    Partnerships for the goals

    Waste owner, host site and buyer in one route.

Framework: UN Sustainable Development Goals. Referring to the goals does not imply endorsement by the United Nations.

A team bridging reactor engineering, chemistry and the market.

  • Vitalii Kardash

    Vitalii Kardash

    CEO & Co-Founder

    Engineering and business development. Deployment of pyrolysis systems, partnerships and commercialization. More than 10 years of delivering technical projects.

  • Anna Pachkovska

    Anna Pachkovska

    CSO & Co-Founder

    PhD in chemistry. Development of pyrolysis processes, material analysis and post-treatment. Almost 10 years of laboratory and applied work.

Laboratories

  • MPA-IfW · TU Darmstadt
  • FTZ Leipzig · HTWK Leipzig
  • ASG Analytik
  • Faserinstitut Bremen (FIBRE)

Supported by

  • MIL Pioneer Funding · HIGHEST, TU Darmstadt
  • HIGHEST Company Builder
  • Sozialinnovator Award 2025
  • Hessischer Gründerpreis 2025 · Semi-finalist
  • Marburger Ideenwettbewerb 2025 · Finalist (MAFEX)
  • AXEL Climate Camp 2025
  • VCI Hessen Push Track
  • BRYCK Startup Alliance Sprint 2026
  • ECCA · Member

Asked often.

What can I do with end-of-life wind turbine blades in Germany?

Landfilling has not been permitted since 2005, so blades go to co-processing in cement, to lower-value products — or into a recovery route. We take blade segments, recover the fiber by pyrolysis and document every batch. The first step is a Recovery Screening of your material.

Do you recycle glass fiber (GFRP) and carbon fiber (CFRP) composites?

Our focus today is GFRP from rotor blades and production scrap. CFRP follows its own qualification path and is handled as a separate assessment. For any other composite stream, the Recovery Screening shows whether a credible route exists.

Does recovered fiber lose strength after pyrolysis?

Fiber properties depend on the process regime and the post-treatment, and they are measured — not assumed. Independent laboratories have examined fiber surface and morphology; the industrial pilot measures properties against buyer specifications over repeated batches.

How is this different from cement co-processing or mechanical shredding?

Cement co-processing uses the composite as fuel and mineral input; shredding turns it into filler. In both cases the fiber is gone. Our route keeps the fiber long, cleans it and qualifies it for a new application.

What does a Recovery Screening include?

A material and problem assessment, a screening of possible recovery routes, an initial sample test where it is technically justified, and a decision memo: go, investigate or no-go. It costs €2,900 and comes with a basic Digital Recovery Record.

Can you install a processing module at our site?

Yes — that is the partner hub format. The containerized modules are placed on an existing industrial site with infrastructure and permits; we run the route and quality assurance. We start with a site assessment.

What is a Digital Recovery Record and how does it help with ESG and CSRD reporting?

It is a structured batch record: what entered, what happened, what came out, how it was tested and what was decided. Waste owners use it as documented evidence of the downstream route for their reporting.

I am looking for recycled glass fiber. Can I get samples?

Yes. Tell us your application and the parameters that matter to you. We provide samples with the available analyses and involve you in defining the criteria for the industrial pilot.

Sources for this section

  1. Composites waste and recycling assessment 2025 (EU27 + UK + TR)

    EuCIA — European Composites Industry Association, 2025 — Modelled estimate, as reported by Recycling Magazine on 21 July 2025

    Open source (opens in a new tab)
  2. Wind industry calls for Europe-wide ban on landfilling turbine blades

    WindEurope, 2021

    Open source (opens in a new tab)
  3. Recycling von Windkraftanlagen — Deponierung von Rotorblättern seit 2005 verboten

    EnBW Energie Baden-Württemberg, 2024

    Open source (opens in a new tab)